ÎÄÕ·ÖÀà
³©ÏúÎÄÕÂ
ÏÂÔØÓÐÓÃ×ÊÁÏ
- Aerobus Schedule (Apr 2010)
- Skybus Schedule (Apr 2010)
- Star Shuttle Schedule (Apr 2010)
- Taxi Fare from LCCT (Apr 2010)
- KTM Komuter Route Map
- KTM Komuter Timetable Jan 2010 (Port Klang to Sentul)
- KTM Komuter Timetable Jan 2010 (Sentul to Port Klang)
- KTM Komuter Timetable Jan 2010 (Rawang to Seremban)
- KTM Komuter Timetable Jan 2010 (Seremban to Rawang)
- KTM Train Information Jan 2010
ÔÚÏßÃûµ¥
µ±Ç°ÓÐ 94 λ·Ã¿Í ÔÚÏß
Comments by The Star's Readers
Date time unknown
Lim C K
i think this terminal was built hastily and many areas were not factor in. since it was going to be used by low cost carrier, maybe everything was done based on a cheap concept. as i notice from the layout plan and the floor area, it seems more like a huge empty factory with limited features and facilities. perhaps the mind set for those planning for the terminal is short sighted¡
Edmund
I see a low of complaints from your article about the new LCCT. First of all, it is great that we could open the new LCCT so soon, even slightly earlier than Singapore¡
